Evaluation of the Effects and Risks of Cost Estimation on Project Costs and Claims: A Study in Imo State, Nigeria
Abstract
The construction industry is challenged with project risks often resulting from cost estimating uncertainties. Previous research shows that 50% of construction disputes are estimating-risk related, leading to poor project performance. This study investigated the effects of charge evaluating risks on project cost overrun and resultant claims to improve project efficiency. The investigation was carried out using well-structured questionnaires addressed to construction professionals in Imo state to determine the critical cost estimating risks and identify principal evaluating risk-related claims contributing to cost overrun in construction project delivery. The results reveal that design issues (design complexity, preliminary design, and design errors) are the key contributors to cost estimating uncertainties. Inadequate cost data, estimator's expertise, and omission in contract documents are the principal causes of evaluating risk-related claims in construction projects. The study concluded that the inaccurate estimation of construction costs eventually leads to claims and cost overruns in the delivery of building projects. It's possible that the risk involved in cost evaluation is to blame for this. Estimators with sufficient efficiency, skill, and experience should be included in estimating to increase the likelihood that the estimates will be close to correct. The study recommends the availability of concise designs and specifications and details as well as updated market surveys to eliminate uncertainties and improve cost data before estimating a construction project.
References
O. C. Narh, E. E. Owusu, K. Oduro-Apeatu, and T.-W. J. Narh, “An exploratory study of professional conflicts and disputes within the construction industry,” Int. J. Manag. Stud. Res., vol. 3, no. 12, pp. 44–65, 2015.
W. Hughes, R. Champion, and J. Murdoch, Construction contracts: law and management. Routledge, 2015.
T. Cunningham, “Contractors’ claims for loss and expense under the principle ‘traditional’forms of Irish building contract,” 2014.
A. F. Chalmers, What is this thing called science? Hackett Publishing, 2013.
J. O. Dada and G. O. Jagboro, “An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry,” J. Financ. Manag. Prop. Constr., 2007.
B. S. Shapiro, “Construction claims and contracting strategies,” 2004.
J. Adafin, J. O. B. Rotimi, and S. Wilkinson, “Risk impact assessments in project budget development: Architects’ perspectives,” Archit. Eng. Des. Manag., vol. 12, no. 3, pp. 189–204, 2016.
G. Younis, G. Wood, and M. A. A. Malak, “Minimizing construction disputes: the relationship between risk allocation and behavioural attitudes,” Women’s career Adv. Train. Dev., vol. 728, 2008.
G. K. Kululanga, W. Kuotcha, R. McCaffer, and F. Edum-Fotwe, “Construction contractors’ claim process framework,” J. Constr. Eng. Manag., vol. 127, no. 4, pp. 309–314, 2001.
C. P. Ogbu and C. F. Asuquo, “Ethical and cost performances of projects: a canonical correlation,” Int. J. Ethics Syst., 2018.
P. Szymański, “Risk management in construction projects,” Procedia Eng., vol. 208, 2017.
I. H. Seeley, “The Construction Industry,” in Quantity Surveying Practice, Springer, 1997.
I. Mahamid, “Contractors perspective toward factors affecting labor productivity in building construction,” Eng. Constr. Archit. Manag., 2013.
I. Mahamid, A. Al-Ghonamy, and M. Aichouni, “Major factors influencing employee productivity in the KSA public construction projects,” Int. J. Civ. Environ. Eng. IJCEE-IJENS, vol. 14, no. 01, pp. 16–20, 2013.
A. Rezaian, “Time-cost-quality-risk of construction and development projects or investment,” Middle-East J. Sci. Res., vol. 10, no. 2, pp. 218–223, 2011.
T. M. Toole, “Information technology innovation: a view of large contractors,” in Construction Research Congress: Wind of Change: Integration and Innovation, 2003, pp. 1–8.
N. Butcher and L. Demmers, Cost estimating simplified. Libris Design Project, 2003.
P. Christensen, L. R. Dysert, J. Bates, D. Burton, R. C. Creese, and J. Hollmann, “Cost Estimate Classification system-as applied in engineering, procurement, and construction for the process industries,” AACE Int. Recomm. Pract., pp. 1–30, 2005.
L. R. Dysert, “Sharpen your cost estimating skills,” Cost Eng., vol. 45, no. 6, p. 22, 2003.
L. R. Dysert, “An introduction to the certified estimating professional (CEP) certification,” Cost Eng., vol. 49, no. 8, p. 13, 2007.
M. D. Dell’Isola, “Detailed cost estimating,” Excerpt from Arch. Handb. Prof. Pr., pp. 1–13, 2003.
A. Ashworth, K. Hogg, and C. Higgs, Willis’s practice and procedure for the quantity surveyor. John Wiley & Sons, 2013.
M. Brook, Estimating and tendering for construction work. Routledge, 2016.
A. Ashworth and M. Skitmore, “Accuracy in estimating,” Cost Model., 1999.
R. Flanagan and G. Norman, “Risk management and construction. Victoria, Australia.” Blackwell Science Pty Ltd, 1993.
R. Flanagan and L. Marsh, “Measuring the costs and benefits of information technology in construction,” Eng. Constr. Archit. Manag., 2000.
C. Black, A. Akintoye, and E. Fitzgerald, “An analysis of success factors and benefits of partnering in construction,” Int. J. Proj. Manag., vol. 18, no. 6, pp. 423–434, 2000.
A. Akintoye and M. Beck, Policy, management and finance of public-private partnerships. John Wiley & Sons, 2009.
S. AlKass and A. Jard, “A conceptual cost estimating computer system for building projects,” in 28th World Congress on Housing Challenges for the 21st Century, 2000, pp. 15–19.
A. Abdou, J. Lewis, and S. Alzarooni, “Modelling risk for construction cost estimating and forecasting: a review,” in 20th Annual ARCOM Conference, 2004, vol. 1, pp. 141–152.
National Research Council, Improving the accuracy of early cost estimates for federal construction projects. National Academies Press, 1990.
N. J. Smith, Appraisal, risk and uncertainty. Thomas Telford, 2003.
A. A. Shash and N. H. Abdul-Hadi, “Factors affecting a contractor’s mark-up size decision in Saudi Arabia,” Constr. Manag. Econ., vol. 10, no. 5, pp. 415–429, 1992.
A. Ashworth and S. Perera, Cost studies of buildings. Routledge, 2015.
Project Management Institute (PMI), “Driving Success in Challenging Times.” 2012, [Online]. Available: https://www.pmi.org/learning/thought-leadership/pulse/driving-success-in-challenging-times-2012.
A. S. Akintoye and M. J. MacLeod, “Risk analysis and management in construction,” Int. J. Proj. Manag., vol. 15, no. 1, pp. 31–38, 1997.
H. Odeyinka and J. Lowe, “An analysis of the impacts of risks and uncertainties on construction cash flow forecast,” in RICS COBRA Conference, 2001, pp. 37–47.
R. M. Wideman, “First principles of project management,” AEW Serv. Vancouver, BC Corp., 2000.
R. Eadie, M. Browne, H. Odeyinka, C. McKeown, and S. McNiff, “A survey of current status of and perceived changes required for BIM adoption in the UK,” Built Environ. Proj. Asset Manag., 2015.
G. M. Winch, Managing construction projects. John Wiley & Sons, 2009.
B. Bernstein, Pedagogy, symbolic control, and identity: Theory, research, critique, vol. 5. Rowman & Littlefield, 2000.
J. Von Neumann and O. Morgenstern, “Theory of games and economic behavior,” in Theory of games and economic behavior, Princeton university press, 2007.
D. Kahneman and A. Tversky, “Prospect theory: An analysis of decision under risk,” in Handbook of the fundamentals of financial decision making: Part I, World Scientific, 2013, pp. 99–127.
H. A. Odeyinka, J. Lowe, and A. Kaka, “An evaluation of risk factors impacting construction cash flow forecast,” J. Financ. Manag. Prop. Constr., 2008.
L. O. Oyewobi, A. D. Ibrahim, and B. O. Ganiyu, “Evaluating the impact of risk on contractor’s tender figure in public buildings projects in Northern Nigeria,” 2012.
J. E. Isimemen, “A Study of Risk Management Practices in the Nigerian Construction Industry.,” 2014.
J. Ramus, S. Birchall, and P. Griffiths, “Contract Practice for Surveyors (Forth Edition),” Elseveir, Gt. Britain, 2006.
J. Murdoch and W. Hughes, Construction contracts: law and management. Routledge, 2002.
C. E. Mitchell, Contract law and contract practice: bridging the gap between legal reasoning and commercial expectation. Bloomsbury Publishing, 2013.
A. H. Memon and I. A. Rahman, “SEM-PLS analysis of inhibiting factors of cost performance for large construction projects in Malaysia: perspective of clients and consultants,” Sci. World J., vol. 2014, 2014.
S. L. Chan and M. Park, “Project cost estimation using principal component regression,” Constr. Manag. Econ., vol. 23, no. 3, pp. 295–304, 2005.
N. Azhar, R. U. Farooqui, and S. M. Ahmed, “Cost overrun factors in construction industry of Pakistan,” in First International Conference on Construction in Developing Countries (ICCIDC–I), Advancing and Integrating Construction Education, Research & Practice, 2008, pp. 499–508.
N. R. Mansfield, O. O. Ugwu, and T. Doran, “Causes of delay and cost overruns in Nigerian construction projects,” Int. J. Proj. Manag., vol. 12, no. 4, pp. 254–260, 1994.
P. F. Kaming, P. O. Olomolaiye, G. D. Holt, and F. C. Harris, “Factors influencing craftsmen’s productivity in Indonesia,” Int. J. Proj. Manag., vol. 15, no. 1, pp. 21–30, 1997.
A. Omoregie and D. Radford, “Infrastructure delays and cost escalation: Causes and effects in Nigeria,” 2006.
A. Omoregie, O. J. Ebohon, and D. Radford, “Modelling in ranking procedures: a case study of infrastructure failures in Nigeria,” 2005.
A. U. Elinwa and S. A. Buba, “Construction cost factors in Nigeria,” J. Constr. Eng. Manag., vol. 119, no. 4, pp. 698–713, 1993.
F. P. Eshofonie, “Factors affecting cost of construction in Nigeria,” Unpubl. M. Sc. thesis, Univ. Lagos, Akoka, 2008.
L. E. Shapiro, Mengajarkan Emotional Intelligence Pada Anak. Jakarta, 1998.
D. R. Cooper, P. S. Schindler, and J. Sun, Business Research Methods, vol. 9. Mcgraw-hill New York, 2006.
A. A. Aibinu and G. O. Jagboro, “The effects of construction delays on project delivery in Nigerian construction industry,” Int. J. Proj. Manag., vol. 20, no. 8, pp. 593–599, 2002.
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Copyright of the published article belongs to the authors and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 (CC BY SA) International License that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgment of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See the Effect of Open Access).